Facilities

February 11, 2010

 

The transition of SIS to CSSD’s network infrastructure is essentially complete. We are currently awaiting the availability of wireless service.

Facilities Management is working on the basic infrastructure design (HVAC & power) for the computing / teaching laboratory on the 8th floor. Faculty are encouraged to consider how their evolving teaching needs should be reflected in the configuration of the lab space (e.g., whether there remains a role for desktop machines or the lab should be equipped with more specialized peripheral & display equipment, essentially requiring students to bring their own laptop machines).

Top